Our Projects.

Beacon Point Telecommunications Mast

Prepared a landscape effects assessment and supporting visuals for a proposed telecommunications mast in Beacon Point, Wānaka. 

Greerton Telecommunications Mast

Prepared a technical landscape effects memo and associated visuals to support an application for resource consent for a proposed telecommunications mast in Greerton, Tauranga. 

Milton Telecommunications Mast

Prepared detailed advice and engagement with Council regarding the potential effects of a proposed telecommunications mast in Milton, Otago. 

Mt Iron Telecommunications Mast

Prepared a landscape effects assessment with associated visuals for the re-consenting of a temporary telecommunications mast within an outstanding natural landscape. 

Ōkere Hydro Electricity Scheme

Prepared a landscape mitigation masterplan, overview video and a landscape effects assessment to support an application for a new hydroelectricity power station near Rotorua. 

Waipipi Wind Farm

Acted as a resource consent commissioner appointed to hear and determine an application to construct and operate a wind farm near Waverley. 

Whakapapa Wastewater Plant

Assisted the Department of Conservation in designing and consenting a replacement wastewater treatment plant within the Tongariro National Park (a World Heritage Area). 

Transpower Atiamuri Substation

Prepared a landscape effects assessment and associated visualisations for the expansion of the Atiamuri substation. 

Vodafone Whangamātā

Prepared a visual effects assessment and associated visualisations for a proposed new telecommunications mast in Whangamātā.

Transpower SH29 Pole Relocation

We prepared a landscape effects assessment and associated visual material to support the relocation of transmission towers to make way for the development of SH29.